1 Preface
2 Scope and Methodology
2.1 Study Objectives
2.2 Stakeholders
2.3 Research Methodology
3 Executive Summary
3.1 Market Scenario
3.2 Raw Material Requirements
3.3 Income Projections
3.4 Expenditure Projections
3.5 Profit Analysis
4 Global Bottled Water Market
4.1 Market Overview
4.2 Historical and Current Market Performance
4.3 Impact of COVID-19
4.4 Market Breakup by Segment
4.5 Market Breakup by Region
4.6 Price Trends
4.6.1 Raw Material Price Trends
4.6.2 Bottled Water Price Trends
4.6.3 Product Margins
4.7 Market Forecast
4.8 Competitive Landscape
4.8.1 Market Structure
4.8.2 Key Players
4.8.3 Profiles of Key Players
5 Detailed Process Flow
5.1 Product Overview
5.2 Various Types of Unit Operations Involved
5.3 Quality Assurance Criteria
5.4 Technical Tests
5.5 Mass Balance and Raw Material Requirements
6 Project Details, Requirements and Costs Involved
6.1 Land, Location and Site Development
6.1.1 Overview of Land Location
6.1.2 Selection Criteria and Significance
6.1.3 Location Analysis
6.1.4 Project Planning and Phasing of Development
6.1.5 Environmental Impact
6.1.6 Land Requirement and Costs
6.2 Plant Layout
6.2.1 Overview
6.2.2 Importance and Essentials
6.2.3 Layout
6.2.4 Factors Influencing Layout
6.3 Plant Machinery
6.3.1 Machinery Requirements
6.3.2 Machinery Costs
6.3.3 Machinery Suppliers (Provided on Request)
6.3.4 Machinery Pictures
6.4 Raw Materials
6.4.1 Raw Material Requirements
6.4.2 Raw Material Details and Procurement
6.4.3 Raw Material Costs
6.4.4 Raw Material Suppliers (Provided on Request)
6.4.5 Raw Material and Final Product Pictures
6.5 Packaging
6.5.1 Packaging Overview
6.5.2 Packaging Requirements
6.5.3 Packaging Material Details and Procurement
6.5.4 Packaging Costs
6.5.5 Packaging Material Suppliers (Provided on Request)
6.6 Transportation
6.6.1 Transportation Overview
6.6.2 Transportation Requirements
6.6.3 Transportation Costs
6.7 Utilities
6.7.1 Energy Requirements and Costs
6.7.2 Water Requirements and Costs
6.7.3 Costs Related to Other Utilities
6.8 Human Resource Requirements and Wages
6.8.1 Total Human Resource Requirement
6.8.2 Salary Costs
6.8.3 Overview of Employee Policies
7 Loans and Financial Assistance
8 Project Economics
8.1 Capital Cost of the Project
8.2 Techno-Economic Parameters
8.3 Income Projections
8.4 Expenditure Projections
8.5 Product Pricing and Margins
8.6 Taxation
8.7 Depreciation
8.8 Financial Analysis
8.8.1 Liquidity Analysis
8.8.2 Profitability Analysis
8.8.2.1 Payback Period
8.8.2.2 Net Present Value
8.8.2.3 Internal Rate of Return
8.8.2.4 Profit and Loss Account
8.8.3 Uncertainty Analysis
8.8.4 Sensitivity Analysis
8.8.5 Economic Analysis
9 Regulatory Procedures and Approval
10 Certification Requirement
11 Key Success and Risk Factors
12 Strategic Recommendations
13 Case Study of a Successful Venture
Capital requirements generally include land acquisition, construction, equipment procurement, installation, pre-operative expenses, and initial working capital. The total amount varies with capacity, technology, and location.
To start a bottled water manufacturing business, one needs to conduct a market feasibility study, secure required licenses, arrange funding, select suitable land, procure equipment, recruit skilled labor, and establish a supply chain and distribution network.
Bottled water production requires purified water, plastic resins like PET (polyethylene terephthalate) for bottles, and materials for caps and labels (typically polypropylene and paper or plastic). Filtration and disinfection use carbon filters, RO membranes, UV, or ozone. Optional minerals or CO2 may be added.
The bottled water factory typically requires water treatment systems (filtration, UV, RO), bottle blowing or filling-capping-labeling machines, and packaging equipment. Storage tanks, quality testing tools, and conveyors are also essential for smooth production.
The main steps generally include:
Water source identification and filtration
Purification (e.g., reverse osmosis, UV treatment)
Filling and capping
Labeling and packaging
Quality control and testing
Usually, the timeline can range from 9 to 12 months to start a bottled water manufacturing plant, depending on factors like planning, machinery procurement, installation, staff training, and obtaining licenses. The timeline can vary based on plant size and local regulations.
Challenges may include high capital requirements, securing regulatory approvals, ensuring raw material supply, competition, skilled manpower availability, and managing operational risks.
Typical requirements include business registration, environmental clearances, factory licenses, fire safety certifications, and industry-specific permits. Local/state/national regulations may apply depending on the location.
The top bottled water manufactures are:
Danone S.A.
The Coca-Cola Company
Nestle SA
PepsiCo Inc.
Bisleri International Pvt. Ltd.
Essentia Water, LLC
Gerolsteiner Brunnen GmbH & Co. KG
Profitability depends on several factors including market demand, production efficiency, pricing strategy, raw material cost management, and operational scale. Profit margins usually improve with capacity expansion and increased capacity utilization rates.
Cost components typically include:
Land and Infrastructure
Machinery and Equipment
Building and Civil Construction
Utilities and Installation
Working Capital
Break even in a bottled water manufacturing business typically range from 2 to 4 years, depending on factors like initial investment, production scale, market demand, and operational efficiency. Strong marketing and distribution strategies can help accelerate profitability.
Governments may offer incentives such as capital subsidies, tax exemptions, reduced utility tariffs, export benefits, or interest subsidies to promote manufacturing under various national or regional industrial policies.
Financing can be arranged through term loans, government-backed schemes, private equity, venture capital, equipment leasing, or strategic partnerships. Financial viability assessments help identify optimal funding routes.