1 Preface
2 Scope and Methodology
2.1 Study Objectives
2.2 Stakeholders
2.3 Research Methodology
3 Executive Summary
3.1 Market Trends
3.2 Raw Material Requirements
3.3 Income Projections
3.4 Expenditure Projections
3.5 Profit Analysis
4 Global Mono Ethylene Glycol (MEG) Market
4.1 Market Summary
4.2 Historical and Current Market Trends
4.3 Impact of COVID-19
4.4 Market Breakup by Segment
4.5 Market Breakup by Region
4.6 Price Trends
4.6.1 Raw Material Price Trends
4.6.2 Mono Ethylene Gycol (MEG) Price Trends
4.6.3 Product Margins
4.7 Market Outlook
4.8 Competitive Landscape
4.8.1 Market Structure
4.8.2 Key Players
4.8.3 Profiles of Key Players
5 Detailed Process Flow
5.1 Product Summary
5.2 Various Types of Unit Operations Involved
5.3 Quality Assurance Criteria
5.4 Technical Tests
5.5 Mass Balance and Raw Material Requirements
6 Project Details, Requirements and Costs Involved
6.1 Land, Location and Site Development
6.1.1 Overview
6.1.2 Selection Criteria and Significance
6.1.3 Location Analysis
6.1.4 Project Planning and Phasing of Development
6.1.5 Environmental Impact
6.1.6 Land Requirement and Costs
6.2 Plant Layout
6.2.1 Overview
6.2.2 Importance and Essentials
6.2.3 Layout
6.2.4 Factors Influencing Layout
6.3 Plant Machinery
6.3.1 Machinery Requirements
6.3.2 Machinery Costs
6.3.3 Machinery Suppliers (Provided on Request)
6.3.4 Machinery Pictures
6.4 Raw Materials
6.4.1 Raw Material Requirements
6.4.2 Raw Material Details and Procurement
6.4.3 Raw Material Costs
6.4.4 Raw Material Suppliers (Provided on Request)
6.4.5 Raw Material and Final Product Pictures
6.5 Packaging
6.5.1 Packaging Overview
6.5.2 Packaging Requirements
6.5.3 Packaging Material Details and Procurement
6.5.4 Packaging Costs
6.5.5 Packaging Material Suppliers (Provided on Request)
6.6 Transportation
6.6.1 Transportation Overview
6.6.2 Transportation Requirements
6.6.3 Transportation Costs
6.7 Utilities
6.7.1 Energy Requirements and Costs
6.7.2 Water Requirements and Costs
6.7.3 Costs Related to Other Utilities
6.8 Human Resource Requirements and Wages
6.8.1 Total Human Resource Requirement
6.8.2 Salary Costs
6.8.3 Overview of Employee Policies
7 Loans and Financial Assistance
8 Project Economics
8.1 Capital Cost of the Project
8.2 Techno-Economic Parameters
8.3 Income Projections
8.4 Expenditure Projections
8.5 Product Pricing and Margins
8.6 Taxation
8.7 Depreciation
8.8 Financial Analysis
8.8.1 Liquidity Analysis
8.8.2 Profitability Analysis
8.8.2.1 Payback Period
8.8.2.2 Net Present Value
8.8.2.3 Internal Rate of Return
8.8.2.4 Profit and Loss Account
8.8.3 Uncertainty Analysis
8.8.4 Sensitivity Analysis
8.8.5 Economic Analysis
9 Regulatory Procedures and Approval
10 Certification Requirement
11 Key Success and Risk Factors
12 Strategic Recommendations
13 Case Study of a Successful Venture
Capital requirements generally include land acquisition, construction, equipment procurement, installation, pre-operative expenses, and initial working capital. The total amount varies with capacity, technology, and location.
To start a mono ethylene glycol (MEG) production business, one needs to conduct a market feasibility study, secure required licenses, arrange funding, select suitable land, procure equipment, recruit skilled labor, and establish a supply chain and distribution network.
Mono ethylene glycol (MEG) production requires ethylene as the primary raw material, which is first oxidized to ethylene oxide. Water is then reacted with ethylene oxide to produce MEG. Catalysts and utilities like steam and cooling water are also needed.
The mono ethylene glycol (MEG) factory typically requires ethylene oxidation reactors, absorption towers, hydrolysis reactors, distillation columns, heat exchangers, pumps, storage tanks, and process control systems. Safety and emission control systems are also critical due to hazardous reactions.
The main steps generally include:
Sourcing and preparation of ethylene
Ethylene oxide production through ethylene oxidation
Ethylene oxide hydration to produce MEG
Separation and purification through distillation
Waste management and by-product handling
Packaging and distribution of the final product
Usually, the timeline can range from 12 to 36 months to start a mono ethylene glycol (MEG) production plant, depending on factors like plant size, technology selection, environmental approvals, and engineering complexity. Custom design and integration with upstream/downstream facilities can extend timelines.
Challenges may include high capital requirements, securing regulatory approvals, ensuring raw material supply, competition, skilled manpower availability, and managing operational risks.
Typical requirements include business registration, environmental clearances, factory licenses, fire safety certifications, and industry-specific permits. Local/state/national regulations may apply depending on the location.
The top mono ethylene glycol (MEG) manufactures are:
Indian Oil Corporation Ltd.
Pon Pure Chemicals Group
Acuro Organics Ltd.
SABIC
Euro Industrial Chemicals
Shell
Profitability depends on several factors including market demand, production efficiency, pricing strategy, raw material cost management, and operational scale. Profit margins usually improve with capacity expansion and increased capacity utilization rates.
Cost components typically include:
Land and Infrastructure
Machinery and Equipment
Building and Civil Construction
Utilities and Installation
Working Capital
Break even in a mono ethylene glycol (MEG) production business typically range from 3 to 7 years, depending on capital investment, feedstock pricing, plant efficiency, and market demand. Strategic location near ethylene sources can improve profitability.
Governments may offer incentives such as capital subsidies, tax exemptions, reduced utility tariffs, export benefits, or interest subsidies to promote manufacturing under various national or regional industrial policies.
Financing can be arranged through term loans, government-backed schemes, private equity, venture capital, equipment leasing, or strategic partnerships. Financial viability assessments help identify optimal funding routes.